Metadata last updated on Oct 29, 2021
Compare
Version : 
The Millennium Challenge Corporation (MCC) provided funds for the upgrade of two roads in Vanuatu. These were the Efate Ring Road and the Santo East Coast Road. Both these roads were unpaved (coral) roads and were sealed with a double surface dressing in 2009/10. The length of road sealed in Efate was 92.5 km and 57.2 km in Santo. An HDM-4 analysis was conducted to examine:

i) The economic viability of upgrading the two roads
ii) The future performance of the roads
Metadata
View More
Data Access and Licensing
Classification: Public
This dataset is classified as Public under the Access to Information Classification Policy. Users inside and outside the Bank can access this dataset.
License: License specified externally
This dataset is licensed under License specified externally
Statistics
Views (359)
Downloads (0)
Share Metadata
The information on this page (the dataset metadata) is also available in these formats.
EmailJSON
Emergency Contact Number (US): (202) 458-8888|© 2022 The World Bank Group, All Rights Reserved