Metadata last updated on Jan 19, 2023

Data collected and prepared from the Kazakhstan’s National Transmission Grid map, for a WBG published report - Stuck in transition: reform experiences and challenges ahead in the Kazakhstan power sector. Includes transmission lines, substations, as well as power stations. Includes existing as well as planned projects. To learn more, please visit http://www.worldbank.org/en/country/kazakhstan/publication/kazakhstan-po...

Citation: Aldayarov, Mirlan; Dobozi, Istvan; Nikolakakis, Thomas. 2017. Stuck in transition : reform experiences and challenges ahead in the Kazakhstan power sector. Directions in Development. -- Energy and Mining. Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/104181488537871278/Stuck-in-tr...

This data is based on a digitized PDF map, and so is intended as a schematic of rough locations of the power network. It is not suitable for applications requiring high accuracy.

Planned Transmission Substations
  • json
  • Last Updated: Nov 14, 2018
  • Size: 14.3 KB
METADATA
Existing Transmission Substations
  • json
  • Last Updated: Nov 14, 2018
  • Size: 82.6 KB
METADATA
Kazakhstan’s National Transmission Grid Map
  • pdf
  • Last Updated: Feb 2, 2021
METADATA
Planned Transmission Substations
  • zip
  • Last Updated: Nov 14, 2018
  • Size: 4.2 KB
METADATA
Existing Transmission Substations
  • zip
  • Last Updated: Nov 14, 2018
  • Size: 11.2 KB
METADATA
Metadata
View More
Data Access and Licensing
Classification: Public
This dataset is classified as Public under the Access to Information Classification Policy. Users inside and outside the Bank can access this dataset.
License: Creative Commons Attribution 4.0
This dataset is licensed under Creative Commons Attribution 4.0
Statistics
Views (323)
Downloads (53)
Share Metadata
The information on this page (the dataset metadata) is also available in these formats.
EmailJSON
Emergency Contact Number (US): (202) 458-8888|© 2022 The World Bank Group, All Rights Reserved