Armenia - Power Plants

Primary tabs

Data collected and prepared for a project of the World Bank Group - ELECTRICITY SUPPLY RELIABILITY PROJECT in Armenia.

This data is based on a digitized PDF map, and so is intended as a schematic of rough locations of the power network. It is not suitable for applications requiring high accuracy. The PDF map can be viewed on the last page of report attached.

To learn more about the project, please visit http://projects.worldbank.org/P116748/electricity-supply-reliability-pro...

Type: 
Geospatial
Topics: 
Energy and Extractives
Economy Coverage: 
Economy Coverage not specified
Languages Supported: 
English
Geographical Coverage: 
Armenia
Tags: 
External Contact Email: 
GP & CCSAs: 
Energy & Extractives
Access Options:
Download
Release Date: 
January 1, 2011

Harvest Source

Harvest Source: 
EnergyData.info

Harvest Source ID

Harvest Source ID: 
d1a55a13-6851-4b7f-a63a-c79034e3fd44

Last Updated

Last Updated: 
October 16, 2017
Publisher Name: 

Naichen Zhao

PDF

Electricity Supply Reliability Project

The proposed additional financing for the Electricity Supply Reliability Project for Armenia would scale up project activities to enhance the impact of the ongoing project and finance the cost of rehabilitation of three substations essential for Armenia’s power transmission network. The proposed objective is to increase the reliability and capacity of the power transmission network. The objective would not change with the proposed AF and the implementation arrangements would remain the same. The project consists of two components, the first being strengthening of the power transmission network which remains the same as the parent project expect that it will be modified to finance only rehabilitation of Haghtanak, Charentsavan, and Vanadozer. The second component will also remain the same except that it will be modified to also finance goods, technical assistance, including Training and Operating costs, to HVEN to strengthen its capacity in operation and maintenance of power transmission network assets.

Resource Type: Download Format: PDF

No Visualizations Available.

Data collected and prepared for a project of the World Bank Group - ELECTRICITY SUPPLY RELIABILITY PROJECT in Armenia.

This data is based on a digitized PDF map, and so is intended as a schematic of rough locations of the power network. It is not suitable for applications requiring high accuracy. The PDF map can be viewed on the last page of report attached.

To learn more about the project, please visit http://projects.worldbank.org/P116748/electricity-supply-reliability-pro...

FieldValue
Groups audience
Modified Date
2019-05-04
Release Date
Periodicity
Periodicity not specified
Identifier
c5583783-f157-4a15-badf-df538eb24d03
License
License Not Specified
Rating: 
0
No votes yet
Type: 
Languages Supported: 
Economy Coverage: 
Publisher Name: 
Naichen Zhao
GP & CCSAs: 
Geographical Coverage: 
Data Classification of a Dataset: 
Source Type: 
GEE
Release Date: 
Saturday, January 1, 2011
Last Updated Date: 
Monday, October 16, 2017
External Contact Email: 
Granularity: 
Harvest Source: 
Harvest Source ID: 
d1a55a13-6851-4b7f-a63a-c79034e3fd44
Modified date: 
17455
Primary Dataset: 
Yes
collection_field: 

Data Access and Licensing

This dataset is classified as Public under the Access to Information Classification Policy. Users inside and outside the Bank can access this dataset.

This dataset is licensed under CC-BY 4.0

CC-BY 4.0

Share Metadata

The information on this page (the dataset metadata) is also available in these formats.

PRINT EMAIL JSON RDF